In the morning we got our resources together and started plotting out the area where we were going to dig up. Four sticks were placed at each point in the ground to start off with. After that measurements were taken from the distance from the shed already standing to the sticks.



After setting out we started using the pick ack to get the right depth in order to lay the foundations down. Once we dug 5 of the trenches we headed for lunch.



In the afternoon we made a start on the paving, we had to dig around the perimeter of the old paving first and take them out so that digging could be done.